Week 5: 09/19 - 09/26

On 09/21:

  • 3 team members met in person in the library to work on presentation and discuss future plans of the project
    • The last member keep in contact through a group message
  • Presentation Sl

Future plans execution:
  • Gather information of desired motor specs
  • Finding sponsors to fund the motor
  • Decide on the motor (4 hub motors)
  • Opening the hub motors and redesign it to support a single shaft. 
  • Redesign the housing of the motor to fit better on the bogie
  • Finalize on designs 
  • Assembly and Manufacture
  • Finalize products on bogie
  • Makers Faire