2nd Semester Week 10: 04/10 - 04/17
This week the motor team worked on updating our presentation due to not being able to present the previous week. We helped guideway team move the track into our new superway location. We also ordered and delivered the second motor controller and relay contacts to controls team. We worked together and was able to get the motor up and running. We had a previous issue of believing that the motor was unidirectional. But after testing, the motor is able to move forward and backward. We have completely scrapped the idea of a third motor since we no longer have any use for it. We were able to have central shop manufacture our motor shaft first for us to do further test what we will be implementing on the drive bogie. However, the tap was made too big. The CAD drawings XOFO provided had false information and we did not double check that before manufacturing. We have to reorder another stock material for retapping. This time, we had the technician at central shop measure the size from our motor for proper sizing of the tap.
Comments
Post a Comment